Raynool Blog
By Tony Huang | 06 December 2022 | 0 Comments

Low PIM RF Connector, from 2.2-5 to 7/16 DIN

Low PIM RF Connector, from 2.2-5 to 7/16 DIN


Low PIM RF Connector
  • Optimized for premium VSWR and PIM levels
  • Wide range of connector series
  • Types include: male, male right-angle, female, female bulkhead and flange mount, female right-angle.

    2.2-5
    2.2-5 RF Connector exhibits some important differences when compared with other Low PIM Connectors, the size is smaller than type N and 4.3-10, while have a good PIM performance better than -161 dbc @ 2*43 dbm.
2.2-5 have a broad cable selection, and can attach up to 1/2'' corrugated, normally, RG402(.141''), RG401(.250'') and 1/4'' Superflexible is most popular.
Solder type, Clamp type available and Raynool can customize design as per requested.
Manufacturing Lead time is 2 weeks.

Type N
Type N is one of the most traditional connector interface, and feature PIM performance -155 dbc @ 2*43 dbm.
Manufacturing Lead time is 2 weeks.

4.3-10
4.3-10 is one of the most popular Low PIM connector, the most important feature may be the separation of the electrical and mechanical mating planes within the connector. It's robust design guarantee a excellent PIM performance of -161 dbc @ 2*43 dbm, which nominally up to -170 dbc.
Manufacturing Lead time is 2 weeks.

7/16 DIN
7/16 DIN Connector size is quite big and normally come with 1/2'', 7/8'' corrugated cable, the PIM performance is excellent benefit from the robust interface, however, with 5G calling for compact design, it gave place to 4.3-10 and other interface.
Manufacturing Lead time is 2 weeks.

QMA
QMA push pull design make it stand out, though the PIM performance is inferior to 4.3-10, 2.2-5, Raynool is few of the factory which have the ability to build the QMA with stable PIM performance.
Manufacturing Lead time is 2-3 weeks.

RF Adapter
Raynool manufacture a full series Low PIM RF adapter, in-series and inter-series, including bulkhead design, customized 2 hole flange / 4 hole flange mount. For field application, equipment, test & measurement.
Manufacturing Lead time is 2-3 weeks.

Leave a Reply

Your email address will not be published.Required fields are marked. *
Name
E-mail
Content
Verification code
ver_code